GE

GE is powering the future of the oil and gas industry, providing smart equipment for subsea, floating and onshore LNG extraction and production, plus services to support the entire project life cycle and technology to detect any problems before they begin.

For models not found on our website, please send your enquiry to [email protected] or click here.


Products (Total Items: 96)
Sort by:
More results: 1 2 3 Next Page View All
DS200FSAAG2ABA | GE PC Amplifier Board
Average Rating
Estimated Lead Time: 2 - 4 Weeks
DS200TCPSG1A | GE Power Supply DC Input Board
Average Rating
Estimated Lead Time: 2 - 3 Weeks
DS200TCTSG1A | GE Power MKV Cards
Average Rating
Estimated Lead Time: 2 - 3 Weeks
226A1413P004 | GE Solenoid Valve
Average Rating
Estimated Lead Time: 2 - 3 Weeks
272A6619P022 | GE Thermometer
Average Rating
Estimated Lead Time: 8 - 10 Weeks
272A6619P030 | GE Thermometer
Average Rating
Estimated Lead Time: 8 - 10 Weeks
329A3529P022 | GE 40ft Cable with 3ft Armored
Average Rating
Estimated Lead Time: 3 - 5 Weeks
CL01A310TS | GE Contactor
Average Rating
Estimated Lead Time: 1 - 2 Weeks
344A9322G001 | GE Seismic Velocity Sensor
Average Rating
In stock. Usually ships in 7 - 10 working days.
DS3800NTCF | GE Thermocouple Card
Average Rating
Estimated Lead Time: 2 - 4 Weeks
91490465P002 | GE High-Temperature Velocity Sensor
Average Rating
Estimated Lead Time: 3 - 5 Weeks
SELA36AT0030 | GE Circuit Breaker
Average Rating
Estimated Lead Time: 1 - 2 Weeks
329A3529P029 | GE Vibration Transducers
Average Rating
Estimated Lead Time: 2 - 4 Weeks
IS220UCSAH1A | GE Mark VIe Controller
Average Rating
In stock. Usually ships in 7 - 10 working days.
IS220PPROH1A | GE Mark VIe Backup Turbine Protection I/O Pack
Average Rating
In stock. Usually ships in 7 - 10 working days.
DS220TCDAH1B | GE Mark V Card
Average Rating
Estimated Lead Time: 2 - 3 Weeks
351A3488P033 | GE Thermocouple
Average Rating
Estimated Lead Time: 4 - 6 Weeks
351A3488P026 | GE Thermocouple
Average Rating
Estimated Lead Time: 4 - 6 Weeks
351A3488P081 | GE Thermocouple
Average Rating
Estimated Lead Time: 4 - 6 Weeks
315A2065P002 | GE Thermocouple
Average Rating
Estimated Lead Time: 4 - 6 Weeks
109E3763P950 | GE Proximity Probe
Average Rating
Estimated Lead Time: 4 - 5 Weeks
354A1513P152 | GE Turbine Lead
Average Rating
Estimated Lead Time: 6 - 8 Weeks
354A1515P132 | GE Lead Ignition
Average Rating
Estimated Lead Time: 6 - 8 Weeks
109E3763P200 | GE Cable Extension
Average Rating
Estimated Lead Time: 6 - 8 Weeks
354A1513P114 | GE Spark Plug Lead
Average Rating
Estimated Lead Time: 6 - 8 Weeks
320B6928G007 | GE Thermocouple
Average Rating
Estimated Lead Time: 4 - 6 Weeks
382A4169P0001 | GE Pressure Switch
Average Rating
Estimated Lead Time: 6 - 8 Weeks
382A4173P0001 | GE Pressure Switch
Average Rating
Estimated Lead Time: 6 - 8 Weeks
More results: 1 2 3 Next Page View All